How canals work
View up the flight of locks on the Caledonian Canal at Fort Augustus in Scotland. The canal drops to the level of Loch Ness at these locks. |
Contents |
[edit] Introduction
Canals are human-made channels used for water conveyance (supply), or to service water transport vehicles. The oldest known canals were used for irrigation purposes, built in approximately 4000 BC in the region of the Middle East that is now modern day Iraq and Iran.
[edit] How canals are constructed
Canals can be constructed in different ways:
- A new canal can be created by excavating the body of the canal and providing water from an external source, such as streams or reservoirs.
- Dredging a channel in the bottom of an existing lake which is then drained.
- A stream can be canalised to make its navigable path more predictable and easier to manoeuvre. This involves dredging, damming and modifying its path.
[edit] What canals do
Canals use engineered structures such as:
- Weirs and dams: To raise river water levels to usable depths.
- Looping descents: To create a longer and gentler channel around a stretch of rapids or falls.
- Locks: So that ships and barges can ascend and descend.
[edit] Canal locks in action
A lock consists of a lock chamber which may be made from brick, stone or metal. This chamber holds the water. There are typically gates at each end of the lock chamber, and these gates control the flow of water.
When a vessel is at a lower point, a gate is allowed to open, which permits water to enter the lock and fill it with water. Once the water level is at the higher height, the vessel can continue on its journey.
The opposite action is used when the vessel is at a higher position and needs to proceed to a lower level. The vessel enters the lock with a high water level and then a gate opens - allowing the water to be released. When the water is at the adjusted lower level, the vessel is able to proceed.
In most instances, the main lock gates can only be opened when the water on both sides is at the same level. This means that the top lock only opens if the lock is full, and the bottom lock only opens when it is nearly empty.
[edit] Legging it
Legging was an early method of navigating vessels through canal tunnels. This practice was sometimes used during the 18th and early 19th centuries.
When horses, donkeys or other towing animals were not able to follow a towpath through a tunnel, people would have to move the boat with their feet by “walking” along the wall or roof of the canal tunnel. Professional wall walkers could be hired to take the vessels on longer tunnels, but it was more common for the operator of the boat to handle the task with assistance from the crew.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.